Skip to content
RACEON

Gallery

A court, from
timber to match point.

Photographs from RACEON's own sites, in the order the work actually happens — sawn teak stacked on a floor, the framework going down over it, and the hall that ends up getting used.

01

The material

African teak and seasoned pine, on site before anything is fixed.

Bundles of sawn teak stacked in a finished room, waiting to be laid

Teak, delivered

Sawn and bundled, waiting on the floor it is about to become.

02

The framework

Chemically treated pine, set out in both directions and interlocked at every crossing.

Pine members being set out across a hall floor, timber stacked alongside

Setting out

Members going down across the slab, the grid taking shape.

The framework running the length of a hall, boards following behind it

Both directions

The framework running the length of the hall, boards following it.

03

The deck

Boards straight onto the completed frame. No plywood, no underlayment.

Deck part laid in a dark-clad hall with clerestory windows above

Advancing

Teak reaching out across a hall still in its shell.

A hall fully decked in teak, before sanding and finish

Fully decked

Every board down. Nothing sanded yet, nothing sealed.

04

The finish

Industrial sanding to a true plane, then a water-based polyurethane.

Finished squash court in maple, red lines to the front wall

Squash, in maple

Front-wall lines set, floor lines run to meet them.

Finished timber floor running out to the doorway of a smaller room

Out to the threshold

Sanded, sealed, and carried right to the doorway.

A finished floor under daylight from a full wall of windows

Under daylight

Grain reading end to end along a full wall of windows.

The finish reading the ceiling line back across a completed floor

The seal

The finish handing the ceiling line back across the floor.

05

The light

Fixtures outboard of the sidelines, so nothing sits over a rally.

Fixtures in a fitted-out ceiling, access still up

Fixtures in

Ceiling fitted out, access still standing.

Two fixture rows running the length of a steel-framed hall

Two rows

Running the length of a steel-framed hall.

06

In play

Markings to international dimensions, freestanding posts, and a hall that gets used.

Markings set out on a completed teak court, fixtures lit above

Marked out

Set out on finished teak, fixtures lit above it.

Nets up on a finished court, a blue-clad hall around it

Posts and nets

Freestanding, nothing fixed through the floor.

A tournament mat rolled over a finished court

Mat over timber

A tournament mat rolled over the finished court.

Match play under a full installation

In use

The best sign a floor is right is that nobody is thinking about it.